Pump station – Hamilton District Council

Home > Project > Pump station – Hamilton District Council

Pump station

Pukete Water Treatment Plant

To accommodate the growth of Hamilton, the Pukete WWTP is currently in the process of being upgraded to increase its total capacity. This is by the construction of a new bio-reactor, clarifier, RAS pump station, IPS pump station and chemical facility. To complete this project Neo has partnered with Stantec to provide the electrical and control system design. This provided HCC with a complete multidiscipline team.

To accommodate all this new electrical infrastructure, Neo designed:

  • A new 2500A switchboard MCC C/D for bioreactors 4,5&6, clarifiers 4,5&6, RAS PS and IPS PS
  • A new switchboard and control cabinet for the chemical storage facility
  • A new PLC node on the control network for MCC C/D and chemical facility
  • Detailed electrical drawings for all new equipment (motor, instruments, valve, etc.)
  • Detailed 3D BIM model for all cable routes

In addition, Neo interfaced with electricity network operator WEL on the installation of dual transformers from the existing MV ring main network.

Neo provided assistance during the tender and construction phases and evaluation to ensure a successful installation and project for HCC.

Pump Station

Our clients

Auckland Airport
Fonterra
Putewa Cemetary and Crematorium
Hastings District Council
Hamilton City Council
Matamata Piako District Council
Napier City Council
Hauraki District Council
OnGas
Otorohanga District Council
Rotorua Lakes Council
Redstag Timber
Top Energy
Vector
Waikato District Council
Waipa District Council
Watercare
Whakatane District Council
Western Bay of Plenty District Council